OMVG Project

Testing and commissioning of substation protection, SCADA and telecom systems for the OMVG energy interconnection, working alongside Siemens across four countries.

Ref. I0016-1100-MSA-CON-097 – M23

Client

Siemens

Funding

African Development Bank (AfDB) and Worl

Location

Guinea, Guinea-Bissau, Senegal, The Gamb

Period

2020 – ongoing

Sector

Energy

Reference

I0016-1100-MSA-CON-097 – M23

The Project

The OMVG project connects the power grids of its member countries, Guinea, Guinea-Bissau, Senegal and The Gambia, to enable energy exchanges and improve the quality of electricity supply.

IBS Group supports Siemens on the project through three specialist units, from factory acceptance tests to on-site commissioning and after-sales support.

Countries interconnected
0
Specialist IBS units
0
Funders: AfDB and World Bank
0

Scope of work

Protection unit

Design, construction, transport and assembly of all accommodation buildings and site facilities, laid out to reach the required room count within the fixed 15-hectare footprint.

SCADA unit

Earth roads and parking built to standard, concrete walkways that keep mud out of buildings, underground services across the site, stormwater channelled to sediment basins, and landscaping.

Telecom unit

Modular rooms with en-suite bathrooms: single senior rooms and double junior rooms, air conditioning, workspace, internet access, full furniture and linen, hard-wearing floors and tiled bathrooms.

Services delivered

  • Training on Siemens Digital Grid technol
  • Pre-FAT and FAT participation to prepare
  • Testing and commissioning of substation automation and protection
  • Testing and commissioning of substation communication systems
  • Testing and commissioning of the Grid Control Centre (dispatching)
  • Service and support for Siemens' installed base in Guinea and neighbouring countries