Testing and commissioning of substation protection, SCADA and telecom systems for the OMVG energy interconnection, working alongside Siemens across four countries.
Ref. I0016-1100-MSA-CON-097 – M23
Client
Siemens
Funding
African Development Bank (AfDB) and Worl
Location
Guinea, Guinea-Bissau, Senegal, The Gamb
Period
2020 – ongoing
Sector
Energy
Reference
I0016-1100-MSA-CON-097 – M23
The OMVG project connects the power grids of its member countries, Guinea, Guinea-Bissau, Senegal and The Gambia, to enable energy exchanges and improve the quality of electricity supply.
IBS Group supports Siemens on the project through three specialist units, from factory acceptance tests to on-site commissioning and after-sales support.
Protection unit
Design, construction, transport and assembly of all accommodation buildings and site facilities, laid out to reach the required room count within the fixed 15-hectare footprint.
SCADA unit
Earth roads and parking built to standard, concrete walkways that keep mud out of buildings, underground services across the site, stormwater channelled to sediment basins, and landscaping.
Telecom unit
Modular rooms with en-suite bathrooms: single senior rooms and double junior rooms, air conditioning, workspace, internet access, full furniture and linen, hard-wearing floors and tiled bathrooms.