The Project

The Compagnie des Bauxites de Guinée (CBG), the Compagnie des Bauxites et Alumine de Dian Dian (COBAD) and Guinea Alumina Corporation (GAC) agreed to share the existing Boké railway (CFB) to carry their ore to the shipping ports. The three partners appointed SYSTRA Canada / CANARAIL for engineering and procurement, with CBG as project owner for this lot.

As part of the new signalling that raises the railway's capacity, CBG planned fibre optic works to link the technical rooms at Tanènè, GAC Mine, Gobiré and Sangarédi. IBS Group won Lot C101-2-2 through a competitive tender.

Technical zones connected
0
Mining partners sharing the line
0
Lot won by tender
0

Scope of work

Site mobilisation and set-up

Safe mobilisation, demobilisation and site administration

Supply of equipment and materials in the required quantities

Diversion of power poles, water mains and other networks

Physical works to the execution drawings and the owner’s instructions

Enough resources and qualified staff on site at all times

Temporary access and water crossings, kept in good condition

Engineer’s approval of the compliance of the works

Services delivered

  • Site preparation
  • Fibre optic pulling
  • Supply and installation of pull boxes
  • Supply and laying of warning mesh
  • Trench excavation
  • Engineered backfill
  • Supply and laying of HDPE ducts
  • OTDR testing and measurement, with documentation
  • Removal of existing fibre optic

The project in pictures

Working on a similar project?

Tell us about your needs. The Group can bring the whole chain, from engineering to operations.