Simandou Construction Camp

Design, supply, construction and operation of a 15-hectare temporary construction camp for Rio Tinto's Simandou project, from accommodation to catering, laundry and site services.

Ref. I0016-1100-MSA-CON-097.3

Client

Rio Tinto Simfer

Funding

Rio Tinto Simfer

Location

Beyla, Guinea

Period

In progress

Sector

Construction et infrastructures

Reference

I0016-1100-MSA-CON-097.3

The Project

The Simandou project covers iron ore exploration and mining in Forest Guinea and Upper Guinea, about 550 km south-east of Conakry, at the southern end of the 110 km Simandou range. It also includes a 643 km heavy-haul Trans-Guinean railway and a deep-water port on the Morebaya River, south of Conakry. With a target of 100 Mtpa of high-grade iron ore, Simandou is one of the world's major mining and infrastructure projects.

For the early works phase, IBS Group designs, builds and runs the temporary construction camp, providing all supervision, labour, staff, consumables, meals, linen, equipment and transport needed to manage, operate and maintain it.

The contract is delivered in two separable parts: first the design, supply and construction of the accommodation and camp facilities, then the management of the camp and its facilities.

Facilities are removed at the end of the contract. Some rooms and facilities may be kept after construction, subject to separate negotiation.

Fixed camp footprint
0 ha
People served by the kitchen and dining
0
Contract parts: build, then operate
0

Scope of work

The camp pad itself is built by others: a platform of at least 15 hectares with a minimum 2% cross-fall. IBS Group delivers everything on it.

Accommodation and camp facilities

Design, construction, transport and assembly of all accommodation buildings and site facilities, laid out to reach the required room count within the fixed 15-hectare footprint.

Roads, parking, walkways and drainage

Earth roads and parking built to standard, concrete walkways that keep mud out of buildings, underground services across the site, stormwater channelled to sediment basins, and landscaping.

Accommodation units

Modular rooms with en-suite bathrooms: single senior rooms and double junior rooms, air conditioning, workspace, internet access, full furniture and linen, hard-wearing floors and tiled bathrooms.

Camp management

Day-to-day operation and maintenance of the camp and all its facilities for the contract period.

Services delivered

  • Kitchen and dining hall for 500 to 3,500 people
  • Outdoor sports field and Guinean sports areas
  • Wastewater treatment plant
  • Bus pick-up and drop-off point
  • Laundry with bulk linen store
  • Security facility at the access gate
  • Maintenance facility
  • Medical treatment centre
  • Retail outlet
  • Mosque
  • Wet bar and outdoor café
  • Camp administration and operations office
  • Gym with equipment
  • Luggage storage

The project in pictures

Working on a similar project?

Tell us about your needs. The Group can bring the whole chain, from engineering to operations.