Canga Camp Extension

Renovation of existing facilities and dormitories, and construction of 100 new modular rooms with en-suite toilets, to extend the Canga camp for the Simandou project.

Ref. I0016-1100-MSA-CON-097 – M23

Client

Rio Tinto Simfer

Funding

Rio Tinto Simfer

Location

Beyla, Guinea

Period

2023

Sector

Construction et infrastructures

Reference

I0016-1100-MSA-CON-097 – M23

The Project

The Simandou project covers iron ore exploration and mining in Forest Guinea and Upper Guinea, about 550 km south-east of Conakry. It also includes a 643 km heavy-haul Trans-Guinean railway and a deep-water port on the Morebaya River. With a target of 100 Mtpa of high-grade iron ore, it will help Guinea draw on its mineral wealth and transform the wider economy.

As part of Rio Tinto's early works, IBS Group extended the Canga camp. The scope covered the renovation of existing facilities and dormitories and the construction of 100 new rooms with toilets, built as modules and grouped into 13 blocks. IBS Group provided all supervision, labour, staff, consumables and materials.

New modular rooms with toilets
0
Accommodation blocks
0
Trades delivered on site
0

Scope of work

The camp pad itself is built by others: a platform of at least 15 hectares with a minimum 2% cross-fall. IBS Group delivers everything on it.

Renovation of existing facilities and dormitories

Construction of 100 new rooms with toilets, built in modules

All supervision, labour, staff, consumables and materials

Services delivered

  • Demolition
  • Carpentry
  • Plinth construction
  • Remediation works
  • Module manufacturing
  • Electrical works
  • Module assembly
  • Concrete pedestrian access

The project in pictures