The Project

Rio Tinto awarded Mota-Engil a contract to operate part of its deposit. For the preparatory works, Mota-Engil entrusted IBS Group with the deforestation, clearing, cleaning and topsoil stripping of the work areas.

The full operating area covers 400 hectares, of which 40 hectares were available at the start. The first phase of works therefore focused on those 40 hectares.

Cleared and stripped in phase one
0 ha
Total operating area
0 ha
Contract value
USD 0 M

Scope of work

The camp pad itself is built by others: a platform of at least 15 hectares with a minimum 2% cross-fall. IBS Group delivers everything on it.

Land clearing

Clearing with D6-class bulldozers, with some manual brush cutting and chainsaw work, once the client hands over areas free of expropriations and utility networks. Includes brush clearing and grubbing, plus felling and stump removal of trees 0.20 m in diameter or more. Felled trees are transported for use by local villagers.

Topsoil stripping

Removal of the surface layer of vegetation and organic matter that could destabilise future structures, 10 cm to 100 cm deep depending on the area, hauled about 3 km to storage.

Cut works

Excavation to prepare the platforms for the mining operation.

Services delivered

  • Site preparation and earthmoving
  • Topsoil stripping and haulage to storage
  • Brush clearing and grubbing
  • Cut works
  • Tree felling and stump removal