Design and construction of the temporary site facilities that support Rio Tinto's Ouéléba mine and 60 Mtpa iron ore plant at Simandou: offices, warehouse, laboratory, infirmary, power and water.
Ref. I0016-1100-MSA-CON-097.3
Client
Rio Tinto Simfer
Funding
Rio Tinto Simfer
Location
Beyla, Guinea
Period
In progress
Sector
Construction & Infrastructure
Reference
I0016-1100-MSA-CON-097.3
The Simandou South mining project lies about 550 km east-south-east of Conakry, towards the southern end of the 110 km Simandou range, within SIMFER's mining concession. Its two iron ore deposits, Pic de Fon to the south and Ouéléba to the north, sit about 4 km apart along the ridgeline. Each is about 7.5 km long and up to 1 km wide.
The mine is being developed together with new rail and port infrastructure. To prepare it, Rio Tinto launched a series of construction projects across the site, including this temporary site facility, delivered by IBS Group.
The camp pad itself is built by others: a platform of at least 15 hectares with a minimum 2% cross-fall. IBS Group delivers everything on it.
Business buildings: office, ablutions, warehouse, laboratory
Company parking and drop-off area
Infirmary facilities
Start-up and drop-off areas for contractors' heavy vehicles
Security cabin and bus loading bay
Civil and structural works, including concrete slabs and lawns
Low-voltage power: solar array, battery storage, generator and on-site distribution
Water services: rainwater harvesting, storage tanks, pumps, ablution sanitation, septic tank and wastewater disposal
Soft-shell satellite canteens
Prayer room
Temporary emergency facility